![]() |
|
|||
|
|
||||
|
Our Quality and
Craftsmanship can not
|
For your convenience, the attached PDF, |
|||
![]() |
4 to 6" of Top Soil should be removed to house gravel |
|||
|
|
Gravel is then added to obtain a level site. |
|||
![]() |
This is a photo of a completed level site using a gravel base. |
|||
|
|
The Barn can then be lowered |
|||
|
|
This is a photo of a completed level site using a poured concrete pad rather than gravel for the base.
|
|||
|
|
If the initial site is not level, |
|||
|
|
or small landscape timbers |
|||
|
|
All corners should be |
|||
|
|
||||
|
WMG WOOD & More, 8619 Mentor Ave Mentor, OH 44060, TEL 888.980.9663 info@wmgwood.com |
||||
|
Site Designed and Managed by NDTC.com |
||||